Narnaul Bypass
-
Yamuna Expressway
-
Gulabpura to Chittorgarh
The development plan entails the creation of an Economic Corridor and Feeder Route Package-2 in Haryana, which includes the construction of the proposed Narnaul Bypass spanning 24.0 km in length, as well as the Ateli Mandi to Narnaul Section of NH-11 from km 43.445 to km 56.900, covering a distance of 14.0 km. The project will be implemented on the Hybrid Annuity Mode.
Project Details
Project Name – Narnaul Bypass
Project By – National Highways Authority of India
Total Cost – Rs 801 Crores
The proposed project includes the construction of earthen embankments, culverts, and cart track underpasses for Package A-13, spanning from Km 132.690 to Km 142.740. Additionally, it involves the construction of interchange bridges and vehicular underpasses for Package B-5, covering Km 110.225 to Km 138.00. Furthermore, there is an additional task of constructing earthen embankments, culverts, and cart track underpasses for Package A-15 (b) along the Yamuna Expressway.
Project Details
Project Name – Yamuna Expressway
Project By – Jaypee Associates
Total Cost – Rs 116.06 Crores
The proposed project involves the expansion of the Gulabpura to Chittorgarh section of NH-79 in Rajasthan, specifically from Design Km 138+870 to Km 213+870 (Package-2). The development will be carried out under NHDP Phase V, utilizing the Public Private Partnership (PPP) model on a Design, Built, Operate and Transfer (DBFOT) Toll Basis.
Project Details
Project Name – Gulabpura to Chittorgarh
Project By – Modern Road Makers Private Ltd. (A subsidiary of IRB Infrastructure Developers Ltd.)
Total Cost – Rs 711.33 Crores
-
Kirari Sewage Stagnating
-
Indira Gandhi Canal Project
The Kirari Belt Sewage Project aims to lay down a sewage network in the entire Kirari belt to provide sanitation and pollution-free living conditions to over 7.25 lakh residents in 114 unauthorized colonies and six villages.
Project Details
Project Name – Kirari Sewage Stagnating
Project By – Delhi Jal Board
Total Cost – Rs 479 Crores
Sewer Lines – 423.5 Kms
Manholes – 23900
Capacity of Waste Water Pumping Stations: Prem Nagar – 6.5 MGD , Pratap Vihar – 41 MGD , Bhagya Vihar – 9 MGD
The proposed construction project includes to build 235 dykes for water storage, which has been initiated by government to help farmers for their crop irrigation. The project introduced recently in our list and on-going. It has been claimed to get this project done in 1.5 year.
Project Details
Project Name – Indira Gandhi Canal Project (IGNP) Ramgarh Jaisalmer
Project By – Indira Gandhi Nahar Pariyojana
Total Cost – 19.41 Crores